• MSYH M168 Waterborne two-component epoxy reinforced interface agent
MSYH M168 Waterborne two-component epoxy reinforced interface agent

MSYH M168 Waterborne two-component epoxy reinforced interface agent

Water-based two-component epoxy-reinforced interface agent is used for absorbent base layers such as concrete and mortar. Water-based polymer emulsion; super penetration, can be used for base reinforcement; reduce base absorbency; economical and practical, easy construction.


MSYH M168 Waterborne two-component epoxy reinforced interface agent

MSYH M168 Waterborne two-component epoxy reinforced interface agent Water-based two-component epoxy-reinforced interface agent is used for absorbent base layers such as concrete and mortar. Water-based polymer emulsion; super penetration, can be used for base reinforcement; reduce base absorbency; economical and practical, easy construction.

1.jpg

Sand on the ground is a very common phenomenon. If the ground is sanded before the construction of the rubber floor, special treatment should be carried out, otherwise the self-leveling may crack, causing the rubber floor to not be well pasted. Meisheng Yaheng M168 water-based two-component epoxy reinforced interface agent is used for absorbent base layers such as concrete and mortar. Water-based polymer emulsion; super penetration, can be used for base reinforcement; reduce base absorbency; economical and practical, easy construction.


use:

For concrete, mortar and other absorbent base.


Features:

water-based polymer emulsion;


Super penetration, can be used for base reinforcement;


Reduce the absorbency of the base layer;


Economical and practical, easy to construct.


Basic treatment:

The base layer must be clean and free of substances that affect the bonding properties. According to the corresponding standards and technical data, the grass-roots level shall be inspected, and any defects shall be reported in time. The loose residue or surface must be completely removed by scrubbing or shot blasting. Thoroughly dust the base surface with a vacuum cleaner.

Construction method:

1. Before use, please open the big bucket, then pour the material in the small bucket into the big bucket completely (pay attention to whether the small bucket is completely empty) and stir it with a suitable electric mixer for 2-3 minutes. According to the compactness of the base layer, add 1-1.5 times water of the total amount of the two components, and stir for 3-4 minutes.


2. Immediately use a roller to evenly coat the product on the surface of the base layer, and use a crisscross roller coating.


3. Coat at least twice when used as reinforcement. When used for self-leveling primer, sprinkle 50-100 mesh clean fine sand immediately after the last pass of roller coating.


Precautions:

1. Store in cool, dry conditions. Product may thicken in cold conditions.


2. Fully mix the A/B components until milky white, and then add 1-1.5 times the amount of water and stir. If stratification occurs after standing for a period of time, it needs to be stirred evenly again; the best construction conditions: temperature 23±2℃, relative air Humidity 40%-75%. The temperature of construction materials and ground shall not be lower than 5 ℃. Low temperatures can prolong the curing time, and high temperatures can shorten the working time of the product.


3. When used for reinforcement, two constructions must be carried out. The dosage of the first course: 120-180g/m2, the dosage of the second course: 100-150g/m2.


4. Please wear protective gloves, glasses, etc. during construction to avoid product contact with skin and eyes. In case of contact with skin, wash with plenty of water and soap. In case of contact with eyes, rinse immediately with running water for 15 minutes, then seek medical attention. Do not pour this product down the drain.


Packaging and Storage:

Component A: 4kg/barrel Component B: 6kg/barrel


This product must be stored at 5℃~35℃, and the shelf life is 12 months.





Quote online

Navigator

Contact Hedsom

Contact:Winsom

Mobile:+8618664748006

Email:export@hedsom.com

Comanpy:Hesom SPC flooring

Address:No. 555, Huangpu Avenue East, Tianhe District, Guangzhou, China