EN
Home / Accessories

M760D Antistatic Plastic Flooring Adhesive

Uses:
Decentralized antistatic function-component adhesives suitable for laying all types of static conductive or static dissipative PVC flooring.

Features:
Large Area Coating;
Good construction;
Good initial tack;
Environmental protection;
Containing conductive carbon fibers.

Applicable Substrate

1. For a porous absorbent, strong, dry, smooth, no cracks, no oil, no wax floor.

2. Suitable for hard cement-based self-leveling screed.

3. For overhead wooden flooring, plywood or particleboard cushion.

 

Substrate Treatment

Substrate if has oil contamination, wax water and mold release, required wax water decontamination to treatment ; recommend M318 Water-Based Primer for closed minor sand ground ( porous absorbent subfloor) ; recommend MSYH Self-Leveling Polymer Cement for leveling uneven ground( leveling thickness at least 2mm); recommend MSYH Two-Component Epoxy Moisture Primer for treatment wet subfloor moisture. The subfloor presence of cracks recommend MSYH Two-Component Epoxy Resin Material to repair .

 

Technical Parameters

Color: Gray

PH value: 7-8

Density: 1.4kg / L

Dosage : 250-350g /

Waiting time: About 10 minutes (due to humidity and temperature varies) Construction time: After the completion of the count, within about 30-60 minutes (due to humidity and temperature varies)

Loading time may ≥72h

 

Primary Treatment:

If substrate is oil, water and mold release wax, wax water required decontamination; minor sand from the ground suggested M318 water-based interface agent (porous absorbent layer) bottoming closed; unlevel substrate recommended to use MSYH self-leveling for leveling (leveling thickness of at least 2mm); damp substrate recommended treatment with two component epoxy moisture proof interface agent. Cracks substrate recommends using two-component epoxy repair material.

 

Construction Method:

Without dilution, Stir before using, and then use the appropriate B3 teeth scraping the glue evenly over the surface coated at the substrate level.

According to the construction site of the temperature and humidity, wait about 5-10 minutes (more than 50% of the film becomes transparent) surface can be laid in mortar floor, then push the cork board to flatten the floor, then roll is 50 kg rolling on the paved floor, you can achieve the best results.

 

Packaging and Storage:

25kg plastic drum. This product should be stored indoors 5 ℃ ~ 35 ℃, to prevent freezing, exposure. Shelf life of six months.

Accessories

Request FREE Samples And Factory Prices!
Contact Us Now

welcome!

We care about your inquiry. Fill in your details and we'll contact you shortly.

Send Your Request ×